todolist # 5 - Document the assumptions, constraints and risks
Think of a situation where the project manager changes half way through a project or a project sponsor change half way through a project. For smooth continuity of the project documenting the assumptions, constraints and the highlevel risks (part of the project charter) will help.
Sample assumptions
Sample assumptions
- It is assumed that skilled manpower is available on time
- It is assumed that the required signoffs are obtained on time
- It is assumed that the required clearances are available before the start of the project
Sample constraints
- The project will be completed within 6 months from the start date of the project
- The project will be completed within 60 person months of effort
- The project will use oly open source products
Sample high level risks
- The required manpower is not available on time
- New technology
- Changing requirements